• Alternative Methods for Tubing Removal 

      Sætre, Stian (Master thesis, 2014)
      When the production from a well is no longer profitable, the options are to either permanently plug and abandon (P&A) the well, or to re-use the slot by plugging the original well and sidetrack a new wellbore (slot recovery). ...